Full KRYONITE POWER KPAX glass-house resource recovery facility at twilight

The KPAX™ platform

The next generation
of resource recovery.

Clean energy. Industrial scale.

California still sends more than 40 million tons of material to landfill every year. KRYONITE POWER is developing the infrastructure to recover value from what remains—converting residual waste into reliable energy and recovered materials.

Explore KPAX
Platform250–1000+
Reference class500,000
Generation24/7
ArchitectureFuture ready
Why now

California is entering a new infrastructure cycle.

More than 40 million tons still go to landfill every year, while the state is simultaneously investing in a circular economy and new resource-recovery infrastructure.

The opportunity is no longer simply to manage waste.
It is to recover the value that remains.

Source: CalRecycle, Calendar Year 2024

KPAX™

A scalable infrastructure platform.

Each configuration uses the same fundamental architecture, engineering philosophy and procurement strategy—scaled to the available waste stream, grid connection and local economics.

KPAX 250Regional configuration
KPAX 500Reference configuration
KPAX 750Multi-region configuration
KPAX 1000+Major infrastructure scale
Explore the platform
Full KPAX resource recovery facility with dimensional KRYONITE POWER facade signage
Proven at scale

We are not inventing the boiler.
We are reinventing the infrastructure.

KRYONITE POWER is not betting the company on unproven combustion technology.

We integrate commercially proven systems from established technology and engineering partners into a standardized KRYONITE POWER facility architecture.

See the proven systems
Scale without reinvention

One proven foundation. A platform built to expand.

01Proven industrial technology
02KRYONITE POWER system architecture
03KPAX 500
04KPAX 750
05KPAX 1000+
The KRYONITE POWER advantage

Five principles for investable infrastructure.

01

Proven technology

Established industrial technology.

02

Standardized platform

Repeatable KPAX configurations.

03

Contracted revenue

Waste supply and power offtake.

04

Industrial scale

500,000 tonnes per year and expandable.

05

Community-first design

Architecture that supports community acceptance and project development.

What goes into KPAX?

Infrastructure for the residual fraction.

KPAX is designed for what remains after practical source reduction, reuse, recycling and organics recovery.

01Reduce
02Reuse
03Recycle
04Organics
05KPAX
06Minimal landfill
Why California

The next infrastructure challenge is the residual stream.

77.2Mtons generated
44.7Mtons disposal-related
40.5Mtons total landfill
<1%transformation

Source: CalRecycle, Calendar Year 2024

Understand the opportunity
The first development target

San Diego.

A concrete starting point with a significant residual stream, established waste infrastructure, a large economic base and meaningful electricity demand.

01

Waste

Potential long-term regional supply.

02

Site + permits

Disciplined development before construction.

03

Energy

Potential utility and corporate offtake.

Why San Diego

Core message

California doesn't need another waste company.
It needs infrastructure for what remains after recycling.

KRYONITE POWER develops it